top of page
Search
SUSI

Are you an academic with a passion in digital connectivity, renewable energy, 5G and beyond?

Updated: Jul 19, 2022

A green, connected and prosperous Britain project is aiming at embedding 5G and its advantages into the local and national Grid, empowering prosumers, egressing resilience, flexibility at local and national levels.

Through a series of feasibility trials the network will grow a larger scale system for demonstration and testing, informing industry and beyond of the capabilities available for better integration across multiple levels.

Flexible funds are now available for Feasibility Study projects (3-6 months), deadline 12 August 2022.

Please read the Feasibility Studies Phase1 GUIDELINES-GCPB Network for more details, and download the application forms (two parts) use the links below:

120 views0 comments

Recent Posts

See All

Save the date

The Network Plus team are holding a Winter School event on the 15th and 16th January 2025 at the London South Bank University campus in...

And the winners are...

Thank you to all the applicants of the recent Pilot Study '5G (and beyond) and applications for resilient, flexible Renewable Energy...

New Feasibility Studies In!

Thank you to all those who have applied for our latest round of feasibility studies. All of the applications are being reviewed. The...

Comments


bottom of page